Fachlicher Schwerpunkt dieses Freiberuflers
SAP Basis Consultant3
D0
D1
D2
D3
D4
D5
D6
D7
D8
D9
Austria
Switzerland
All others
Position
Project History
Company : IT Service Company
Project : R/3 server consolidation of 15 different european nations on
7 UNIX and Windows server.
Heterogenous systemcopy (migration) of an R/3 system from SUN
Solaris/Oracle to HPUX/Oracle.
R/3 Enterprise 47x200 Best Practices Chemicals installation on
MS SQL Server 2000 and Windows 2003 (Unicode).
Migration from MS SQL Server 2000 to Oracle 9.2 on Windows 2003
and Enterprise 47x200 Best Practices Chemicals (Unicode).
Upgrade of R/3 Enterprise 47x200 Chemicals to SAP ECC 5.00
(mySAP ERP), basis WAS 640 (Unicode), component BP Chemicals.
R/3 and database installation on HPUX and Windows.
Installations of R/3 dialog instances on RedHat 7.2.
Preparation and planning of the data transfer.
Homogeneous R/3 systemcopy on UNIX and Windows.
Oracle upgrade from 8.1.7 to 9.2.0.5 on HPUX.
R/3 post installation activities.
Post productive problem-management.
Period : 05/04 - 06/04
Company : Insurance
Project : Installation and Implementation of BW 3.1 Content Development
system.
Installation of current support packages and Plug-Ins on BW
system.
Updating to the recent support packages and Plug-Ins on the
R/3 4.70 Backend system as well as the Financial extension
sets.
Creation of a report on user administration within the scope
of Sarbanes-Oxley-Act (SOA).
Daily business in R/3 basis.
Period : 03/04 - 04/04
Company : IT Service Company
Project : Hardwaremigration of a BW 3.0B Landscape from HP-UX 11.11
(PA-Risc 64-Bit) to HP-UX 11.23 IA-64 (Itanium).
Homogeneous System Copy of the Test- and Development-System
and of the productive BW-System.
Database upgrade from 8.1.7.4 to 9.2.0.4.
BW 3.1 Content Installation. Post Installation activities.
Installation and homogeneous systemcopy of a 3-tier R/3
Systemlandscape 4.6C SR2 under Windows 2000.
Installation of Mobile Engine 2.1 SP01, JCO and
J2EE Upgrade on WAS 6.20 under Linux.
Planning and implementation of the R/3 tasks for the going-live phase.
OS-System : Windows 2000, HP-UX 11.23, Linux Red Hat 2.X
Hardware : HP DL 580, 380 (Itanium)
SAP Release(s): 4.6C SR2, WAS 6.20, BW 3.1 Content
database : Oracle 8.1.7, 9.2.0.4
Period : 06/03 - 12/02
Company : Chemical Company, Switzerland
Project : Hardware- and OS-Migration from NT to Windows 2000.
Homogeneous System Copy of the productive BW 3.1 System and
setup as the new BW Quality system in the existing R/3
System landscape. Post Installation activities performed;
Planning and execution of a database migration of a productive
R/3 HR-System to a Network Appliance NAS Filer. Moving of the
centralinstance to a new HP-Server. Preparation and post-installation
activities;
Creation of documentation for the (GMP relevant) Hard- and Soft-
waremigrations with assistance of the document management
system (DMS) by Documentum;
Planning and execution of hardware migrations of R/3
Development Systems to NAS Filer;
Configuration and maintenance of the Czech language on a MDMP
R/3-System on output and frontend level;
Responsible for the R/3 transport management system (TMS);
Monitoring R/3 Systems using the Solution manager and the
System administration assistant;
Monitoring of data uploads and responsible for the transport
system in BW;
Installation and setup of SAP-Router on Windows 2000;
Maintenance and control (technical) of Business Connectors and
EBP-System;
Performance analysis in the SEM-BPS area;
Monitoring of the R/3 Mail- and Fax-Server of third party vendor
Faxination;
Technical contact person of the SAP Developers;
Configuration of the R/3 Server and Frontend-Software for SSO and
User maintenance;
OS-System : Windows 2000, NT 4.0
Hardware : HP, Compaq
SAP Release(s): 4.6C, 4.6D, 6.20
database : Oracle 8.1.7, 9.2
Period : 01/02 - 05/02
Company : IT Company, south Germany
Project : Planning and implementation of Support packages
Update in a productive environment,
Installation of BW Add-Ons,
Upgrade of a BW 2.1 Testsystem to 3.0B,
Setup an R/3 System as a datasource for a SAP BW System,
Perform an Oracle upgrade from 8.0.X to 8.1.7,
Creation of Oracle Instanceprofiles for R/3-, BW-, and CRM systems,
Setup an ABAP/4 Report to distribute transport orders,
Creation of a userexit to record SNC User,
Responsible for the Transport Management System,
Maintenance of R/3 User and authorizations,
Implementation and maintenance of Oracle parameters and ,
Threshold values for the R/3 Monitor (CCMS)
OS-System : NT 4.0Hardware : FSC, Compaq
SAP Release(s): 4.5B, 4.6C/D, 6.10
database : Oracle 8.0.X, 8.1.7
Software : Abap/4
Period : 09/00 - 09/01
Company : IT Company, Germany
Project : Responsible for R/3 performance,
Supporting of ABAP Developers in SAP R/3 Basis,
Creation of customizing profiles with the help of self-made
ABAP/4 reports,
Implementation of master data distribution between two R/3
Systems with ALE,
Archiving of material documents with ADK,
Setup R/3 for sending emails from QM,
Good knowledge in Abap Workflow,
Monitoring interfaces with the tool UC4,
Tuning ABAP/4 programs and SQL statements,
R/3 Gatewayinstallation,
Monitoring d.3 document management system,
Installation of PBS archive add on CFI for financial
accounting on R/3,
Setup an ABAP Report to evaluate the archiv link table
entries and archived documents (PBS)
OS-System : NT 4.0Hardware : Compaq
SAP Release(s): 4.5B
database : Oracle 8.0.X, 8.1.7
Software : Abap/4
Period : 03/00 - 08/00
Company : Utilities, Power Plant (Germany)
Project : R/3 Migration to new Hardware platform,
Installation of 64-bit R/3 System and database,
Performed data transfer for material master with
Batch Input and Direct Input,
Good knowledge in the Legacy System Migration Workbench (LSMW),
ABAP programming in the HR module,
User administration with the profile generator,
Responsible for the R/3 System performance,
Installation and Maintenance of R/3 printers,
Installation of Legal Change Packages and Hotpackages
OS-System : HPUX 10.20, 11.XHardware : HP Server
SAP Release(s): 4.5B
database : Informix 7.30
Software : Abap/4, Shell scripting
Period : 06/99 - 02/00
Company : chemicals (Germany)
Project : Configuration and maintenance of the transport management
system ( TMS ) on release 4.5b,
User administration with the profile generator,
Responsible for the R/3 System performance,
Acquired good knowledge in workbench- and transport organizer,
Acquired experience in R/2 development environment,
Second level support in R/3 Basis
OS-System : OSF1Hardware : DEC
SAP Release(s): 3.1X, 4.5B
database : Oracle 7.X, 8.X
Software : Abap/4
Period : 11/96 - 04/99
Company : Transport (Germany)
Project : Responsible for the R/3 backups and restores (Storagetek backint interface),
Printer equipment installation and maintenance on-site and in
a large number of remote locations (UNIX to NT using the Samba
interface) of appr. 35 R/3 Systems (Releases 2.1 to 4.0),
Administration and execution of Correction and Transports (CTS),
Planning and execution of client copies,
Maintenance of the ALE - Gateway for R/2 - R/3 communication (IDOC),
Maintenance of the CUA-Gateway ( SAPGUI -> R/2),
In charge of the user help desk for Basis related inquiries (first
and second) level support,
Acquired expertise in RFC communication and programming,
In charge of the corporate OSS System,
Adjustments to existing SAPscript outputs
OS-System : SUN Solaris 2.5, 2.6, AIX 4.X, HP/UX 9.X, 10.XHardware : SUN E5000, E10000, IBM RS6000, HP 8000
SAP Release(s): 2.1D -4.0B
database : Oracle 7.X, 8.X
Software : RFC SDK, C, Shell script, Abap/4
Period : 10/96 - 10/96
Company : IT Service Company (Germany)
Project : Installation of Darwin (IS-IS) 2.2F,
Upgrade of Darwin to 2.2F6,
Installation of saprouter,
DB recovery,
Implementation of backup processes
OS-System : NT, HP/UX 9.XHardware : Compaq, HP 3000
SAP Release(s): 3.0, 2.2
database : Oracle 7.0
Period : 07/96 - 08/96
Company : IT Service Company (Germany)
Project : R/3 System Administration,
User and authorization maintenance,
Administration and performance of the Correction
and Transport System (CTS)
OS-System : HP/UX 9.XHardware : HP 3000
SAP Release(s): 3.0D
database : Oracle 7.0
Period : 04/96 - 05/96
Company : car industry (Lithuania)
Project : Prepared and performed workshops in R/3 System Administration
in English for the Russian speaking audience,
Prepared and performed workshops about the R/3 Data Dictionary
in English for the Russian speaking audience,
Performed R/3 Upgrade (30C to 30D) under NT and Adabas D
OS-System : NT 4.0Hardware : Siemens
SAP Release(s): 3.0D
database : Adabas D
Period : 02/94 - 11/96
Comapany : IT Consultancy (Germany)
Project : Responsible for the operation of SAP systems on two
different platforms, including:
Installation and maintenance of the R/3 ? Systems,
Upgrading the R/3 and Oracle/AIX systems,
Backup and recovery of the SAP systems and the databases,
Setup and operation of the Correction and Transport system (CTS),
Setup and maintenance of users and access profiles,
Installation of the International Demonstration- and Education
System (IDES) under AIX,
Setting up remote access via modems for dial-in users,
Maintenance of the LAN with Windows clients
OS-System : NT, AIX 3.X, 4.X, Novell, CiscoHardware : IBM RS6000, RS6000, Cisco
SAP Release(s): 2.1B - 3.1H
database : Oracle 6.X, 7.X
Software : Abap/4
References
Projekt SAP R/3 / BW Basis, 06/03 - 12/03
Referenz durch Chemie-Unternehmen (6200 MA weltweit) vom 26.01.04
"Der Consultant war in der Zeit vom 5. Juni 2003 bis 31. Dezember 2003 in unserer Unternehmung als externer SAP-Basis Berater beschäftigt. [...] Der Consultant erledigte seine Arbeit zu unserer vollsten Zufriedenheit. Er brachte umfangreiche Kenntnisse zur SAP R/3-Basis mit und war stets in der Lage, sich in neue Sachverhalte schnell und umfangreich einzuarbeiten. Der Mitarbeiter zeigte sich immer zuverlässig und zeitlich flexibel. Er war äusserst belastbar und jeder Stresssituation gewachsen."
Projekt SAP R/3 Basisadministration, 01/02 - 05/02
Referenz durch Geschäftsgebietleiter Siemens AG vom 24.10.02
"Dem Mitarbeiter wurden folgende Aufgaben übertragen:
- Einspielen von Support Packages in einer produktiven R/3 Systemlandschaft und Durchführung der
Projekt SAP R/3 Administration, 03/00 - 08/00
Referenz durch Abteilungsleiter eines Energieerzeugers vom 01.09.00
Nacharbeiten
- Upgrade eines SAP BW 2.1 Testsystems auf BW 3.0 und der dazugehörigen Oracle Datenbank von
Industries
Skills
Data OnTap 6.3 Network Appliance
Network Appliance Filer FAS940
SAP R/3: BC (basis), BW, ALE (material management), SEM-BPS (Performance),
Solutionmanager, mySAP ERP, Netweaver 04, Best Practices Chemicals
Samba
Veritas
SUNLink
UC4
PBS
NAS-Filer Network Appliance
Documentum
Compaq System Tools (SmartStart, Insight Manager)
Networker (Legato)
SAP Business Connector Server 4.6
SnapDrive 2.1
Data ONTAP 6.3
Operational experiences
R/3 upgrades, mySAP ERP upgrade, R/3 homogenous and heterogeneous migration (Informix, HP, Oracle, Windows 2000), Installation of R/3 Support
Packages and Add-ins, R/3 Gateway installations, good knowledges in the LSMW ( Legacy
System Migration Workbench), implementation and maintaining of master data distribution
with ALE, Implement the extension to send emails from Quality Management (QM),
Implementation of (basis) User exits in ABAP/4, Single Sign On (R/3), Archiving
with PBS (CFI) and D.3, Installation of Web Application Server (6.10) under Linux.
R/3 Harwaremigrations ( HP, Compaq, Oracle, SnapDrive, BW, Windows 2000).
Training
SAP Classes (R/3)
TADM70 SAP System : Operating System and Database Migration
BIT400 SAP Exchange Infrastructure (XI 2.0)
TTW090 SAP BW Technical Administration
BC010 Basic architecture
BC020 R/3 administration
BC040 Authorization concepts
BC110 Correction and Transport
BC100 R/3 under Oracle
BC030 R/3 Data Dictionary
BC090 R/3 under Unix
IXOS Institute, Munich: R/3 Installation under NT
General
AVP Institute, Frankfurt: Windows/NT administration server
Windows/NT administration workstation
SAP Academy Certification:
Certified Technical Consultant OS/DB Migration for SAP Systems (2003), January 2005
Certified Technical Consultant Unix/Oracle Release 4.X, July 1999
Certified Technical Consultant mySAP Technology-Administration (2002) Unix/Oracle, April 2003
Warehouse (BW) and in Exchange Infrastructure (XI) projects.
Training History
Final examination: Electrical Engineer (Dipl.-Ing. FH)



